The archive can hear this voice. Diarization matches David Tatro to 38 recordings, on the basis of: approved 2026-10-13 from the candidate dossier (scripts/fit_candidates.py): the strongest containment in the archive: voice 5 speaks in 38 of the 50 recordings whose minutes header lists Tatro, and in none of the 22 that do not list him at all — a coincidence rate of 3.1e-10 — with 27 chair-initiated 'Dave' handoffs at 5.5x lift. It sits 0.45 centroid distance from Denault while being heard in 9 recordings where Denault is listed absent, so it is not a second Denault cluster. Audio has not been listened to; the label rests on attendance containment. Confidence: the minutes' officer line rather than a board seat. This name was applied on 2026-10-13 as a decision from the candidate dossier. Nobody has listened to the audio to confirm it, so read it as the archive's best reading of who was in the room, not as a voiceprint match. The quotes below are the longest passages labelled to this person in the transcripts.
Recorded absent: 2025-09-29, 2025-06-02, 2025-04-14, 2025-03-10, 2025-01-13
Actions the minutes gave them (1)
| Date | Action | Where it stands |
|---|---|---|
| 2024-12-19 | Dave Tatro will inspect the road each spring and adjustments to the agreement will be made if needed and any problems will need to be addressed | open |
Money mentioned alongside this name (5)
A keyword match on the financial items, not a claim that this person spent or was paid this money.
| Date | Item | As written |
|---|---|---|
| 2025-05-01 | Dave Tatro said the culvert needed for the Sportsmen Road project will cost $5,500.00 and | $5,500.00 |
| 2025-04-17 | Dave Tatro anticipates the 50 foot culvert would cost $5,500.00 and maybe a deal could be | $5,500.00 |
| 2025-04-03 | Dave Tatro felt a third person would increase his budget by $100,000 and he would rather s | $100,000 |
| 2024-10-03 | Dave Tatro just had the transmission repaired which cost approximately $4,900.00 and it im | $4,900.00 |
| 2024-03-21 | Dave Tatro will apply for a $200,000.00 Class 2 Roadway Grant to resurface East Road | $200,000.00 |
What they said (1225 labelled passages; 10 shown)
2025-10-02 · paragraph 151 · read it in the meeting
“This is the bottom? Yeah, there's nothing ditched into his property, you know, short of him putting in some kind of foundation drain. I believe he's going to have water regardless. There's a well within 20 feet of his foundation, which would just be dry all the time if there wasn't groundwater. There is a natural spring in the middle of Leisure Road right on the corner. You can see it, you know, at times pop up there, and then there's a ledge all through there. I mean, he could put in a foundation drain of some sort. We could put a ditch along the side of the road there, but that would reduce …”
2024-08-15 · paragraph 235 · read it in the meeting
“On a trail, we had no maintenance. My thought is if you're going to put side-by-sides, I mean I had one go by me today up on County Road and you can watch the tires chew. You're going to have instant rill every time somebody comes along. On a trail, we don't have to even worry about that maintenance. Now, I don't know how many side-by-sides will be using that trail, but I'm guessing it's quite a few. And I don't know how the state of Vermont is going to move forward with enforcement on some of this. Right now, they're pretty lenient as far as they're not breathing down our neck with it. But th…”
2024-09-05 · paragraph 241 · read it in the meeting
“Some of these road issues aren't just a summer thing though Middle Road, LaSure Hill, Jepson Hill are winter issues too I mean on a paved road it's a lot Easier especially after the storms over you know you've got a summertime road more or less nowadays on a paved road where On these gravel roads I would say I can't get enough sand they are sanded every single day On bright sunny days sometimes it's the worst because the sand drops through the ice pack and you know You're not even thinking about it you're going down the road and people go off the road on a perfectly nice day you know Yeah So l…”
2026-03-19 · paragraph 689 · read it in the meeting
“They're coming out of our road. Slow down. Yeah. Some of the hills are a little rough with the, you know, the way the torque of the wheels and the grade, you know, some of the material moves and makes them mobile, but you've got to go slow at that time. There's not much I can do about that if I... There's no mud, so if you put stone, you've got a bunch of loose stone. If you put a bunch of gravel, you're going to make mud. You're going to make slime, you're going to try to get up the hill. How many people do you think actually utilize their four-wheel drive? Yeah. How many people do you think …”
2024-03-21 · paragraph 51 · read it in the meeting
“If we went to a 30 inch, it probably isn't going to make much of a difference. To go three foot or larger, it'd have to have a hydraulic study done on it. And then they're going to decide what should be sufficient for that area. I think part of the issue is the fact that it has to make sense. Yeah. To make that 90 degree turn. Yeah. The two footer's probably close to adequate, I would say, if it actually took a direct straight flow. Yeah. But then again, debris could plug it. Yeah. I mean, we had bridges in the July 10th that are engineered by the state to handle the flow that plugged up. And,…”
2026-01-29 · paragraph 290 · read it in the meeting
“Well, listen, I'm just trying to provide reliable service to the business. If these things stay running, I wouldn't care if they're 30 years old. But unfortunately, a lot of the repairs now are like electrical repairs, which you need a computer to diagnose, a computer to reset the computer after you've fixed it. It's like there's no mechanical stuff we still do, but most of it is stuff that you just can't. I mean, we changed the wheel burn, but the ABS light doesn't go well because it trips the wheel burn. And then you don't have four-wheel drive because the ABS light's on. So you've got to go…”
2025-08-07 · paragraph 514 · read it in the meeting
“i would just like to add that i know you're looking at other towns but when you're trying to hire somebody it's a skill set you're trying to hire so that's not the be-all end-all because if you're trying to hire somebody with a certain skill set they're not necessarily going to work for the town skill set so like i said that's that book's not a dln though i don't know exactly who's putting in for this position but i've i've i've done a lot of research on what's going on and and i've made a lot of progress on that but i'm sure that the books are going to get a lot of progress on this position b…”
2026-03-19 · paragraph 675 · read it in the meeting
“Well, I mean, unfortunately, I mean, in a way, if somebody's got to get a load of firewood, it's no different than something you get in a load of oil. Oh, I get it. I mean, so if somebody, I mean, or the electric company, the utility in a way, I mean, I don't know how... Some heavy trucks that go up there for life. Yeah, and if somebody got a box truck delivery today, that's probably almost worse than a log truck, the bank functions in it, because you got it on one set of axles, you know? The UPS and FedEx delivery, I mean, the UPS guy destroyed Klondike Road a week ago. He does. I mean, I jus…”
2024-09-05 · paragraph 522 · read it in the meeting
“There was a mess up there a week or so ago. They brought a 40-yard recycling. So anybody that went up there and said, I probably couldn't throw the recycling out of the field. Let's say they had gotten so far behind that somebody from their Rutland office had to come down and they brought a 40-yarder, which was almost unusable. Then they didn't have to do the compact or anything until that Saturday morning, too, which both were supposed to be done on Thursday because I had called them on Monday. But they made a call the following Monday. They switched out the 40-yarder for the 30-yarder by Wed…”
2025-05-01 · paragraph 170 · read it in the meeting
“that so I did get a price replacement call the color itself is fifty five hundred dollars we only have four thousand on our budget there is a great I could put in for a grant the grants do in December and won't be out till this time next year not gonna be done this summer unless you guys want to full rescind I guess now there are the next thing I'm gonna bring up is that our grant and heed traffic so that I can try and get my funeral segments so I went around with Jim Henderson we last week we identified some problems on sports roads that are undersized so for 2025 we picked a section and then…”
Names come from the minutes and from transcripts corrected against the minutes. Presence is what the minutes state. A mover named in the minutes is not evidence of who spoke in the audio, and an absent member may still have been mentioned.